This gymnasium addition to Justin Hall at St. Francis High School was completed in 2006. With new locker and shower rooms, classrooms, and a training room, the project also added roughly 7,000 sqft. of gym floor area to an existing gymnasium that was already 8,000 sqft.
The design of the exterior was revised from the original design to accommodate a smaller budget. Parts of the existing building, where the addition was connected, were also renovated to make the integration of the new and existing more seamless.