Schneider Services has been involved in many projects at Saint Francis High School. In Friar’s Hall, Pictured above, Schneider Services has renovated the science labs, the administrative area, turned the gym on the ground floor into an art studio, and renovated the existing chapel originally built in 1927.
The chapel restoration work included repairing interior walls damaged by water infiltration, installing new windows, refinishing wood work, masonry pointing and installation of a new roof. The altar layout was redesigned and new floors with new marble inlays installed. The terrazzo floors were adapted and restoration of damaged stations of the cross paintings was coordinated. Finally, the chapel’s original pipe organ was rebuilt.